Concrete Work
Sunday, December 9, 2012
Thursday, November 15, 2012
Pole building in Northampton
Poured a Pole building in Northampton the other day, 43 yrds of concrete, averaged 5 to 8 inches thick.
Frank doin' his power screed thing
Frank doin' his power screed thing
Monday, November 12, 2012
Hockey fire co.
Hockey fire co. A Dave Hess Concrete job.
Frank Carr Concrete started and finished the wall..
Then we(Dave Hess Concrete) go back and finish the flat work.
Then Frank came back to top another ten feet on back wall...
Frank Carr Concrete started and finished the wall..
Then we(Dave Hess Concrete) go back and finish the flat work.
I Helped the Excavating contractor back fill some of it..
Subscribe to: