Concrete Work

Concrete Work
Garage Floor

Thursday, November 15, 2012

Pole building in Northampton

Poured a Pole building in Northampton the other day, 43 yrds of concrete, averaged 5 to 8 inches thick.










                                              Frank doin' his power screed thing








Monday, November 12, 2012

Hockey fire co.

Hockey fire co. A Dave Hess Concrete job.

Frank Carr Concrete started and finished the wall..

Then we(Dave Hess Concrete) go back and finish the flat work.


















I Helped the Excavating contractor back fill some of it..












 Then Frank came back to top another ten feet on back wall...